Iranian Classification Society Rules

< Previous | Contents | Next >

2015


image


 

Rules for the Classification ofSection 1 DefinitionsSection 2 GeneralSection 3 Materials, Welding and ConstructionCHAPTER 2 CLASSIFICATION SURVEYSSection 1 GeneralSection 2 Classification Survey during ConstructionSection 3 Periodical SurveysCHAPTER 3 STEMSSection 1 StemsCHAPTER 4 LONGITUDINAL STRENGTHSection 1 GeneralSection 2 Bending StrengthCHAPTER 5 PLATE KEELS AND SHELL PLATINGSSection 1 GeneralSection 2 Plate KeelsSection 3 Shell Plating for Midship Part of BargeSection 4 Shell Plating for End PartsSection 5 Side Plating in way of SuperstructureSection 6 Local Compensation of Shell PlatingCHAPTER 6 DECKSSection 1 GeneralSection 2 Effective Sectional Area of Strength DeckSection 3 Deck PlatingCHAPTER 7 SINGLE BOTTOMSSection 1 GeneralSection 2 Centre KeelsonsSection 3 Side KeelsonsSection 4 Floor PlatesSection 5 LongitudinalsSection 6 Strengthened Bottom ForwardCHAPTER 8 DOUBLE BOTTOMSSection 1 GeneralSection 2 Centre GirdersSection 3 Side GirdersSection 4 Solid FloorsSection 5 LongitudinalsSection 6 Inner Bottom Plating and Margin PlatesSection 7 Frame End BracketsSection 8 Open FloorsSection 9 Construction of Strengthened Bottom ForwardCHAPTER 9 FRAMESSection 1 GeneralSection 2 Frame SpacingSection 3 Transverse Hold FramesSection 4 Side LongitudinalsSection 5 Superstructure FramesSection 6 Frames in Both PeaksCHAPTER 10 BEAMSSection 1 GeneralSection 2 Deck LoadSection 3 Longitudinal BeamsSection 4 Transverse BeamsSection 5 Beams on Bulkhead Recess and OthersSection 6 Beams on the Top of Deep TanksSection 7 Deck Beams Supporting Specially Heavy LoadsCHAPTER 11 DECK GIRDERSSection 1 GeneralSection 2 Longitudinal Deck GirdersSection 3 Transverse Deck GirdersSection 4 Deck Girders in TanksSection 5 Hatch Side GirdersSection 6 Hatch End GirdersCHAPTER 12 PILLARS AND TRUSSESSection 1 GeneralSection 2 Scantling of PillarsSection 3 TrussesCHAPTER 13 PEAK CONSTRUCTIONSection 1 GeneralSection 2 Arrangements of Construction Forward of the Collision BulkheadSection 3 Arrangements of Construction Abaft After Peak BulkheadCHAPTER 14 WATERTIGHT BULKHEADSSection 1 ArrangementSection 2 ConstructionCHAPTER 15 DEEP TANKSSection 1 GeneralSection 2 Bulkheads of Deep TanksSection 3 Fittings of Deep TanksCHAPTER 16 SUPERSTRUCTURE AND DECKHOUSESection 1 GeneralSection 2 Construction and ScantlingsSection 3 Access Openings in Superstructure End BulkheadsCHAPTER 17 HATCHWAYS AND OTHER DECK OPENINGSSection 1 GeneralSection 2 HatchwaysSection 3 Hatch CoversSection 4 Companion-ways and Other Deck OpeningsCHAPTER 18 BULWARKS, FREEING PORTS, VENTILATORS AND PERMANENT GANGWAYSSection 1 GeneralSection 2 Bulwarks and GuardrailsSection 3 Freeing PortsSection 4 VentilatorsSection 5 Permanent GangwaysCHAPTER 19 EQUIPMENT NUMBER AND EQUIPMENTSection 1 GeneralSection 2 Equipment NumberCHAPTER 20 MACHlNERYSection 1 GeneralSection 2 Internal Combustion EnginesSection 3 Boiler and Pressure VesselsSection 4 Auxiliaries and Piping ArrangementSection 5 General Requirements of Electrical EquipmentSection 6 EarthingSection 7 Protective Devices of Electrical EquipmentSection 8 Source of Electrical PowerSection 9 CablesSection 10 DistributionSection 11 Control GearsSection 12 Explosion-Protected Electrical EquipmentSection 13 Emergency Stopping DeviceSection 14 Machinery and Electrical Equipment of Tank BargesSection 15 Spare PartsSection 16 TestsCHAPTER 21 PONTOON BARGESSection 1 GeneralSection 2 ConstructionSection 3 Peak ConstructionCHAPTER 22 TANK BARGESSection 1 GeneralSection 2 Structural Members in Cargo Oil SpacesCHAPTER 23 BARGES INTENDED TO BE CLASSIFIED AS RESTRICTED SERVICESSection 1 GeneralSection 2 Barges Intended to be classified as Coastal ServiceSection 3 Barges Intended to be classified as Smooth Water Service